Qik-Link temporary raised modular flooring was chosen for the Starbucks Winter Garden Pop-Up at Kings Cross Station this... Read more
Clip Exhibitions Ltd contracted the Qik-Link team to supply and install a 90m2 raised platform for one of their clients at CCR at... Read more
Qik-Link was the selected flooring system for the Leaders Area at the 2014 G20 summit.
The annual summit of the G20 –... Read more
Qik-Link was chosen as the flooring solution for the fit out of British Telecom’s World-Wide Video Conferencing Facility... Read more